Automatic Snacks Frying Machine Installation Method
Here to introduce the installation of the snacks frying machine:
1. First, we should connect the automatic temperature control meter box, blower, lifting motor, residue pump, the total power supply, check the fried baskets rise, down to be normal.
2. Then we should shut down the connecting pipe between the residue pump and the fryer and start to wash the ferrous slag, rust, rubbish and other sundries in the frying machine by pouring water to the frying machine and release it through the manual slag discharge port.
![]() |
| Snacks Frying Machine |
3. And then, we need to install the oil pump and the connection line of the frying line, check the residue pump and fryer all the pipes and fittings do not leak oil, the slag filter wrapped in slag filter bucket, and then into Sheng Oil container. Use the residue pump to pump the oil in the oil container into the fryer (put the oil 15 cm away from the oil pan) and soak the thermocouple metal part of the meter in the oil.
4. Start to heat up
5. Then we need to check whether the thermocouple metal part of the instrument box is immersed in the cooking oil. The temperature control display is normal. Turn the number in the temperature indicator to the temperature (130-190 ° C) that you need the pot. (Two temperature control data are the same)
6. When the temperature reaches 130-190 ℃, it starts to fry a small amount of material.
Now,you may know how to install the automatic snacks frying machine,if you have any other questions,contact me.